Ontario Grain Farmer September 2023

24 DEOXYNIVALENOL (DON) ISa mycotoxin naturally produced by the fungus that causes Gibberella ear rot in grain crops such as corn. Infection begins through the corn silk and proliferates in warm (27 - 28° Celcius), humid weather. Accurate and efficient sampling, detection, and quantification of mycotoxins have been challenging because the toxin is not uniformly distributed in grain, or grain samples, but is critically important as effective sampling leads to fewer false readings and better grain management during grain delivery. Following the record outbreak of Gibberella ear rot in Ontario in 2018, research at the University of Guelph identified several necessary improvements to the DON sampling protocol, intended to help with the accuracy of testing. SAMPLNG PROTOCOL Step 1: Collect a representative grain sample of no less than two kilograms Mycotoxins are not distributed evenly in grain loads; therefore, multiple samples should be taken from a single load to obtain a representative two kilogram sample. Best practices for various scenarios are described below: For delivered grain: Before dumping, ensure at least four pneumatic probe samples are taken. Sampling should comprise the entire vertical profile of the load. Take four separate pneumatic probe samples, from different areas across delivery truck length. For sampling while dumping grain: Dip 250 ml cup into the continuous grain Testing for DON ACHIEVING A CONSISTENT, ACCURATE DON TEST RESULT Alexandra Dacey GIBBERELLA EAR ROT. PHOTO COURTESY OF ALBERT TENUTA. flow multiple times (20 minimum) while grain is unloaded to obtain the required two kilogram sample. For sampling stored grain: Be sure to sample using a probe and pull cores as deep as possible from multiple depths between the bottom and top of the probe depth. Sample in multiple locations around the bin until two kilogram sample is collected. Step 2: Grind the two kilogram grain sample Due to the high variability in mycotoxin content between individual grain kernels, it is crucial to take a grain sample of at least two kilogramand grind the entire sample before remixing the meal and taking the final subsample for DON testing. Grinding an entire two kilogram sample significantly reduced the variability in results when compared to the traditional protocol of sub-sampling of whole kernels. By grinding and mixing an entire two kilogram whole grain sample, only one subsample is required to be within 20 per cent of the actual DON concentration of the grain. In comparison, 11 subsamples using the traditional DON processing methods of whole kernel samplings would be required to obtain this same level of accuracy. Step 3: Sub-sample the two kilogram ground sample From the two kilogram ground sample, collect a 10 - 30 gram subsample (based on the specific test kit instructions) to be used in DON dip test. It is crucial that the test kit instructions are followed accurately to reduce test kit operator error. Note that two different types of rapid tests are marketed — ELISA (enzyme-linked immunosorbent assay) and LFD (lateral flow device), both of which are suitable for on-site testing. Step 4: DON dip Test It is crucial that the test kit instructions are followed accurately to reduce test kit operator error. Follow the test kit Agronomy WHAT QUESTIONS SHOULD YOU ASK AT YOUR ELEVATOR? • Is the elevator subsampling from a two kilogram ground sample? • Does the particle size of the ground corn meet the specifications of the DON test kit? • Is the meal from the entire two kilogram sample remixed after grinding before subsampling? • How is the elevator preventing crosscontamination between ground samples*? * Risk of cross-contamination between samples is low when using the two kilogram sample.

RkJQdWJsaXNoZXIy MTQzODE4